Skip to content

CKS TB38 - 38.1mm (1.5") Rugged Industrial Trackerball

by CKS
SKU: CKS-TB38_38
Sold out
Original price £0.00 - Original price £0.00
Original price
Request a quote
£0.00 - £0.00
Current price

Ruggedised trackerballs are one of the most reliable computer peripheral devices. In fact, many computing devices used for precise system monitoring operations have an integrated industrial-grade trackball.

The CKS TB38 – 38.1 mm (1.5”) rugged industrial trackerball has the features ideal for the steel manufacturing, military, and distribution industries.  It is made with a phenolic resin material which resists wear and liquid chemicals. As a result, it can withstand prolonged use in many industrial processes.

With an extended 3 year warranty as standard, the CKS TB38_38 can handle long-lasting and consistent controls.

Ideal for all industrial, rugged applications, Keyboard Specialists Ltd (KBS) would recommend the CKS range for all controls. Contact a member of the KBS team on 0203 474 0234 for more information.

Technical Specification

  • Approvals: FC, CE, IP, NEMA, ROHS,
  • Cable Length: 2 m
  • Connections: USB / PS2 / AT / RS232 / RS422 / RS485 / XT / TTL / DEC / SUN
  • Dimensions: 38.1mm (1.5")
  • Integrated Peripherals: Trackball
  • IP Rating : IP 65
  • Material: Phenolic Resin Ball
  • Mounting: Can be supplied with interface cabled and buttons for mounting into customers equipment
  • Tracking Force: 20 g
  • Warranty: 3 Year RTB Warranty - Extendable up to 5 Years
  • Weight: 80 g
In Stock
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 4 - 6 Weeks
Lead time: 4 - 6 Weeks
Lead time: 4 - 6 Weeks
Lead time: 4 - 6 Weeks
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days