Skip to content

Purekeys Compact Medical Keyboard - Wired, IP66 rated with Tactile Feedback

SKU: CTM0101
Original price £136.00 - Original price £136.00
Original price
£136.00 + VAT
£136.00 - £136.00
Current price £136.00 + VAT

Introducing Purekeys latest 400 Series design. Now with even more quality and infection control potential.

The 400 Purekeys Desktop USB Keyboard, incorporates the latest design for the best infection control results. The new housing and top surface work together to ensure seamless clean-ability. It only takes between 5-8 seconds.

Rated to IP 66 specifications, the Purekeys flat keyboard can be wiped, sprayed and cleaned with medical grade disinfectants with no ingresses for bacteria to hide.  This Purekeys keyboard has a dedicated Clean Key that disables input when cleaning.

The flat surface still gives maximum tactile feedback for comfortable typing experiences by each user.

With a flat key design with responsive, tactile feedback of a normal keyboard, the Purekeys Medical keyboard has been manufactured for NHS hospital, Dental and Clinical use. 

Contact Keyboard Specialists Ltd (KBS) on 0203 474 0324 for more information on the Purekeys range. 

Technical Specification

  • Approvals: FC, CE, IP, NEMA, ROHS,
  • Cable Length: 1.8 m
  • Dimensions: 386 x 163 x 20 mm
  • Material: Silicone
  • Warranty: 2 Year Manufacturers
In Stock
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 4 - 6 Weeks
Lead time: 4 - 6 Weeks
Lead time: 4 - 6 Weeks
Lead time: 4 - 6 Weeks
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days